Bid it, buy it, build it from the same numbers.

Infrenta keeps your takeoff, bid, buyout, cost report and daily reports on one job. When the structural revision lands, every team can see which quantity they are working from.

Where construction & civil jobs lose the thread.

  • Buyout starts from last week’s bid sheet.

    The estimate moves after bid day. Purchasing copies the quantities it had, and the gap shows up as a change order nobody priced.

  • The cost report is rebuilt every month.

    Budget, commitments and invoices sit in separate files, so the forecast is a reconciliation exercise instead of a decision.

  • Daily reports don’t talk to the estimate.

    Quantities placed in the field are recorded in a different unit and structure than the bid, so production can’t be compared to what you priced.

Revise a quantity on Larkfield Medical Pavilion.

Larkfield Medical Pavilion’s estimate carries 4,860 m³ at $310. A structural revision thickens the suspended slabs on levels 3 to 5. Revise the quantity, issue the revision, and compare what each team is working from.

CON-0331 · Cast-in-place concrete, suspended slabs

Larkfield Medical Pavilion

Emailed workbooks

Each team keeps its own copy of the quantity.

  1. Estimate

    Estimator CON-0331

    5,220m³

    Rev 05Draft

    Rev 05 draft. Not issued yet.

  2. Ready-mix RFQ

    Buyer LMP-CON-012

    4,860m³

    Rev 04Current

    Suppliers are pricing 4,860 m³.

  3. Budget

    Project controls Concrete

    4,860m³

    Rev 04Current

    Carries $1,506,600 for concrete.

  4. Field progress

    Superintendent Pour log

    4,860m³

    Rev 04Current

    1,520 m³ placed: 31.3% complete.

On one Infrenta project

Each team opens the revision the estimator issued, then reviews its own step.

  1. Estimate

    Estimator CON-0331

    5,220m³

    Rev 05Draft

    Rev 05 draft. Not issued yet.

  2. Ready-mix RFQ

    Buyer LMP-CON-012

    4,860m³

    Rev 04Current

    Suppliers are pricing 4,860 m³.

  3. Budget

    Project controls Concrete

    4,860m³

    Rev 04Current

    Carries $1,506,600 for concrete.

  4. Field progress

    Superintendent Pour log

    4,860m³

    Rev 04Current

    1,520 m³ placed: 31.3% complete.

Rev 05 is a draft. Nobody downstream should use it until it is issued.

Infrenta does not change anyone’s numbers behind their back. It keeps the issued revision on the project, so the buyer, controls and the field start from it, and anyone can see which revision a record uses.

Illustrative demonstration. Projects and figures are fictional, not customer data.

Your words, mapped to one record.

Infrenta is configured for construction & civil work. Each part of your process lands in the workflow that carries it forward.

How Construction & civil work maps to Infrenta workflows
You call itIn InfrentaStatus
Takeoff and bidEstimatingIn pilot
Bid-day proposalProposalsIn the product
Subcontract and material buyoutProcurementIn the product
Cost report and change ordersProject ControlsIn the product
CPM schedule and look-aheadSchedulingIn the product
Daily reports, ITPs, punch listsExecutionIn the product
Drawing revisionsDrawingsIn the product

What’s included for construction & civil, and its status today.

Every workspace is opened by arrangement after a conversation. The label beside each capability says how far it is in the product today.

Start from the General Contractor or Heavy Civil pack, with crews and equipment built up line by line.

An issued revision where every total opens into its quantity, rate and formula.

Used by invited estimators while the engine replaces the classic estimator.

Proposals

In the product

Branded bid documents with assumptions and exclusions from the estimate.

A reviewed proposal document and PDF tied to the project.

Procurement

In the product

Buy out subcontracts and materials against the issued quantities.

An awarded commitment on the same lines the estimate issued.

Comparison never awards a supplier. A buyer does.

Project Controls

In the product

Cost report, change records and estimate at completion by cost code.

Estimate at completion and variance on the structure the estimate issued.

It is not a general ledger or treasury system.

Scheduling

In the product

CPM schedule with baselines, float and delay impact.

A baselined schedule and recovery scenarios on the same project.

Execution

In the product

Daily reports, crews, equipment, ITPs, NCRs, punch lists and turnover.

Installed quantities in the units of the estimate, and the closeout record.

It is not a compliance-certification system.

Drawings

In the product

Compare drawing revisions and extract quantities for review.

Reviewed quantities and a record of what changed between drawing revisions.

GeoLab

In the product

Foundation decision support for foundation-heavy civil work.

A reviewed foundation assumption and a consulting-style report.

Decision support. It is not sealed design or a substitute for site investigation.

In the product
Deployed in the application for organizations Infrenta has onboarded.
In pilot
Built and in use with invited users. Not yet the default for every organization.
Reference data
Stored, versioned reference that informs a decision. Not a live feed or advice.
Planned
Designed and on the roadmap. Not available yet.

Bring a real job. We’ll walk it with you.

Tell us which handoff costs you the most: estimate to purchasing, purchasing to cost, or cost to the field. We walk that workflow with you, in your industry’s terms.

See pricing

What happens next

  1. 1Tell us your industry and the handoff that hurts.
  2. 2We reply by email to set a time.
  3. 3We walk it on a worked example and your own project questions.
  4. 4Access, roles, and data handling are on the Security page.