When the isometric changes, everyone should know.

Infrenta carries the estimate into long-lead procurement, cost control, work packs and turnover on one project, so a revised spool count doesn’t hide in a spreadsheet until the field finds it.

Where oil, gas & industrial jobs lose the thread.

  • Long-lead equipment is bought against an old basis.

    The estimate matures from conceptual to definitive while purchase orders go out against whatever version procurement had.

  • EAC lives in a controls spreadsheet.

    Commitments, actuals and change records are rebuilt by hand each period, so the forecast trails the work it is meant to steer.

  • Turnover is assembled at the end.

    Inspection records, NCRs, punch items and commissioning packages sit in separate systems until someone collects them for handover.

Revise a quantity on Cedar Basin Gas Plant Expansion.

Cedar Basin Gas Plant Expansion’s estimate carries 1,240 spools at $1,850. An isometric revision reroutes the compressor tie-ins and adds spools. Revise the quantity, issue the revision, and compare what each team is working from.

PIP-2204 · Fabricated process pipe spools

Cedar Basin Gas Plant Expansion

Emailed workbooks

Each team keeps its own copy of the quantity.

  1. Estimate

    Estimator PIP-2204

    1,336spools

    Rev 05Draft

    Rev 05 draft. Not issued yet.

  2. Spool fabrication RFQ

    Buyer CB-PIP-031

    1,240spools

    Rev 04Current

    Suppliers are pricing 1,240 spools.

  3. Budget

    Project controls Piping

    1,240spools

    Rev 04Current

    Carries $2,294,000 for spools.

  4. Field progress

    Construction manager Spool erection

    1,240spools

    Rev 04Current

    410 spools erected: 33.1% complete.

On one Infrenta project

Each team opens the revision the estimator issued, then reviews its own step.

  1. Estimate

    Estimator PIP-2204

    1,336spools

    Rev 05Draft

    Rev 05 draft. Not issued yet.

  2. Spool fabrication RFQ

    Buyer CB-PIP-031

    1,240spools

    Rev 04Current

    Suppliers are pricing 1,240 spools.

  3. Budget

    Project controls Piping

    1,240spools

    Rev 04Current

    Carries $2,294,000 for spools.

  4. Field progress

    Construction manager Spool erection

    1,240spools

    Rev 04Current

    410 spools erected: 33.1% complete.

Rev 05 is a draft. Nobody downstream should use it until it is issued.

Infrenta does not change anyone’s numbers behind their back. It keeps the issued revision on the project, so the buyer, controls and the field start from it, and anyone can see which revision a record uses.

Illustrative demonstration. Projects and figures are fictional, not customer data.

Your words, mapped to one record.

Infrenta is configured for oil, gas & industrial work. Each part of your process lands in the workflow that carries it forward.

How Oil, gas & industrial work maps to Infrenta workflows
You call itIn InfrentaStatus
Conceptual to definitive estimatesEstimatingIn pilot
Long-lead equipment and bulk materialsProcurementIn the product
Cost reports, EAC and change managementProject ControlsIn the product
Construction schedule and critical pathSchedulingIn the product
Work packs, ITPs, NCRs and HSEExecutionIn the product
Commissioning and turnoverExecutionIn the product
Imported equipment dutyTrade & TariffReference data

What’s included for oil, gas & industrial, and its status today.

Every workspace is opened by arrangement after a conversation. The label beside each capability says how far it is in the product today.

Start from the Pipeline or Process / Industrial pack, with spread crews and equipment built up as resources.

An issued revision where every total opens into its quantity, rate and formula.

Used by invited estimators while the engine replaces the classic estimator.

Procurement

In the product

RFQs, bid evaluation and purchase orders for long-lead and bulk packages.

An awarded commitment on the same lines the estimate issued.

Comparison never awards a supplier. A buyer does.

Project Controls

In the product

Budget, commitments, actuals, governed forecasts and EAC by cost code.

Estimate at completion and variance on the structure the estimate issued.

It is not a general ledger or treasury system.

Scheduling

In the product

Critical path, float, baselines and recovery scenarios.

A baselined schedule and recovery scenarios on the same project.

Execution

In the product

Work packages, daily reports, ITPs, NCRs, HSE records, commissioning and turnover.

Installed quantities in the units of the estimate, and the closeout record.

It is not a compliance-certification system.

Drawings

In the product

Compare drawing revisions and extract bills of material for review.

Reviewed quantities and a record of what changed between drawing revisions.

Trade & Tariff

Reference data

Stored origin and duty scenarios for imported equipment.

A recorded duty and origin assumption.

A stored reference catalog. It is not customs, legal, or tax advice.

Steel Intelligence

Reference data

Stored steel price and escalation references for structural packages.

A documented steel assumption behind an estimate or a buy.

It is not a live mill quote.

In the product
Deployed in the application for organizations Infrenta has onboarded.
In pilot
Built and in use with invited users. Not yet the default for every organization.
Reference data
Stored, versioned reference that informs a decision. Not a live feed or advice.
Planned
Designed and on the roadmap. Not available yet.

Bring a real job. We’ll walk it with you.

Tell us which handoff costs you the most: estimate to purchasing, purchasing to cost, or cost to the field. We walk that workflow with you, in your industry’s terms.

See pricing

What happens next

  1. 1Tell us your industry and the handoff that hurts.
  2. 2We reply by email to set a time.
  3. 3We walk it on a worked example and your own project questions.
  4. 4Access, roles, and data handling are on the Security page.