One pile count, from the layout to the last pile driven.

Solar is where Infrenta went deepest first: layout quantities, foundation decisions, racking estimates, procurement, cost control and field progress on the same record.

Where energy & solar jobs lose the thread.

  • The pile count changes after the geotech.

    Refusal zones and layout changes move quantities after the estimate is out, and the RFQ still carries the old count.

  • Layout, foundations and the estimate live in different tools.

    Each team re-enters the same rows, tables and piles, so a reviewer cannot trace a total back to the site.

  • Installed progress doesn’t match the plan’s units.

    Field reports count piles and tables differently than the estimate, so percent complete is an argument.

Revise a quantity on Red Mesa Solar.

Red Mesa Solar’s estimate carries 12,400 piles at $218. A geotechnical review adds piles in a refusal zone. Revise the quantity, issue the revision, and compare what each team is working from.

EST-FND-012 · W6×9 driven piles

Red Mesa Solar

Emailed workbooks

Each team keeps its own copy of the quantity.

  1. Estimate

    Estimator EST-FND-012

    12,960piles

    Rev 05Draft

    Rev 05 draft. Not issued yet.

  2. Pile RFQ

    Buyer RMS-FND-004

    12,400piles

    Rev 04Current

    Suppliers are pricing 12,400 piles.

  3. Budget

    Project controls Foundations

    12,400piles

    Rev 04Current

    Carries $2,703,200 for piles.

  4. Field progress

    Superintendent Pile install

    12,400piles

    Rev 04Current

    3,180 piles installed: 25.6% complete.

On one Infrenta project

Each team opens the revision the estimator issued, then reviews its own step.

  1. Estimate

    Estimator EST-FND-012

    12,960piles

    Rev 05Draft

    Rev 05 draft. Not issued yet.

  2. Pile RFQ

    Buyer RMS-FND-004

    12,400piles

    Rev 04Current

    Suppliers are pricing 12,400 piles.

  3. Budget

    Project controls Foundations

    12,400piles

    Rev 04Current

    Carries $2,703,200 for piles.

  4. Field progress

    Superintendent Pile install

    12,400piles

    Rev 04Current

    3,180 piles installed: 25.6% complete.

Rev 05 is a draft. Nobody downstream should use it until it is issued.

Infrenta does not change anyone’s numbers behind their back. It keeps the issued revision on the project, so the buyer, controls and the field start from it, and anyone can see which revision a record uses.

Illustrative demonstration. Projects and figures are fictional, not customer data.

Your words, mapped to one record.

Infrenta is configured for energy & solar work. Each part of your process lands in the workflow that carries it forward.

How Energy & solar work maps to Infrenta workflows
You call itIn InfrentaStatus
Layout and quantitiesSolar Layout StudioIn the product
Foundation selectionGeoLabIn the product
Racking and BOS estimateEstimatingIn the product
Module, racking and pile procurementProcurementIn the product
Cost and forecastProject ControlsIn the product
Pile install and mechanical completionExecutionIn the product

What’s included for energy & solar, and its status today.

Every workspace is opened by arrangement after a conversation. The label beside each capability says how far it is in the product today.

Solar Layout Studio

In the product

Site geometry to tables, rows and quantities.

Reviewed layout quantities for estimating and execution.

It does not replace every tracker manufacturer’s design suite.

GeoLab

In the product

Compare driven, helical, ground-screw and ballast foundations from your ground data.

A reviewed foundation assumption and a consulting-style report.

Decision support. It is not sealed design or a substitute for site investigation.

Classic estimating

In the product

Racking and ground-mount estimating with foundations, installation and logistics.

An approved estimate published to the project.

The Solar EPC pack covers racking, foundations, civil, electrical, installation and logistics.

An issued revision where every total opens into its quantity, rate and formula.

Used by invited estimators while the engine replaces the classic estimator.

Procurement

In the product

RFQs and quote comparison against the issued quantities.

An awarded commitment on the same lines the estimate issued.

Comparison never awards a supplier. A buyer does.

Project Controls

In the product

Budget, commitments, actuals and forecast on the estimate’s structure.

Estimate at completion and variance on the structure the estimate issued.

It is not a general ledger or treasury system.

Execution

In the product

Pile installation, production, quality records and closeout.

Installed quantities in the units of the estimate, and the closeout record.

It is not a compliance-certification system.

Steel Intelligence

Reference data

Stored steel and galvanizing assumptions for racking and piles.

A documented steel assumption behind an estimate or a buy.

It is not a live mill quote.

Trade & Tariff

Reference data

Stored origin and duty scenarios for imported racking and modules.

A recorded duty and origin assumption.

A stored reference catalog. It is not customs, legal, or tax advice.

In the product
Deployed in the application for organizations Infrenta has onboarded.
In pilot
Built and in use with invited users. Not yet the default for every organization.
Reference data
Stored, versioned reference that informs a decision. Not a live feed or advice.
Planned
Designed and on the roadmap. Not available yet.

Bring a real job. We’ll walk it with you.

Tell us which handoff costs you the most: estimate to purchasing, purchasing to cost, or cost to the field. We walk that workflow with you, in your industry’s terms.

See pricing

What happens next

  1. 1Tell us your industry and the handoff that hurts.
  2. 2We reply by email to set a time.
  3. 3We walk it on a worked example and your own project questions.
  4. 4Access, roles, and data handling are on the Security page.