Quote the job, buy the steel and ship the package from the same numbers.

Infrenta ties your quote, bill of material, mill orders, job cost and delivery to one project, so a design revision changes what you buy before the shop finds out.

Where manufacturing & fabrication jobs lose the thread.

  • The quote and the BOM drift apart.

    Drawings change after the quote. The shop builds from the new BOM while purchasing orders against the old one.

  • Material prices move between quote and order.

    Steel indices, galvanizing and tariffs change the cost of a job you already priced, and nobody can see by how much.

  • Job cost is known after the job ships.

    Commitments, actuals and change requests live in separate files, so margin is found at the end instead of managed during the job.

Revise a quantity on Kestrel Distribution Centre steel package.

Kestrel Distribution Centre steel package’s estimate carries 486 t at $3,950. A design revision upsizes the mezzanine framing and adds bracing. Revise the quantity, issue the revision, and compare what each team is working from.

FAB-0120 · Fabricated structural steel

Kestrel Distribution Centre steel package

Emailed workbooks

Each team keeps its own copy of the quantity.

  1. Estimate

    Estimator FAB-0120

    528t

    Rev 05Draft

    Rev 05 draft. Not issued yet.

  2. Mill steel RFQ

    Buyer KD-MAT-007

    486t

    Rev 04Current

    Suppliers are pricing 486 t.

  3. Budget

    Project controls Raw material

    486t

    Rev 04Current

    Carries $1,919,700 for steel.

  4. Erection progress

    Erection lead Erected to date

    486t

    Rev 04Current

    160 t erected: 32.9% complete.

On one Infrenta project

Each team opens the revision the estimator issued, then reviews its own step.

  1. Estimate

    Estimator FAB-0120

    528t

    Rev 05Draft

    Rev 05 draft. Not issued yet.

  2. Mill steel RFQ

    Buyer KD-MAT-007

    486t

    Rev 04Current

    Suppliers are pricing 486 t.

  3. Budget

    Project controls Raw material

    486t

    Rev 04Current

    Carries $1,919,700 for steel.

  4. Erection progress

    Erection lead Erected to date

    486t

    Rev 04Current

    160 t erected: 32.9% complete.

Rev 05 is a draft. Nobody downstream should use it until it is issued.

Infrenta does not change anyone’s numbers behind their back. It keeps the issued revision on the project, so the buyer, controls and the field start from it, and anyone can see which revision a record uses.

Illustrative demonstration. Projects and figures are fictional, not customer data.

Your words, mapped to one record.

Infrenta is configured for manufacturing & fabrication work. Each part of your process lands in the workflow that carries it forward.

How Manufacturing & fabrication work maps to Infrenta workflows
You call itIn InfrentaStatus
Quote and bill of materialEstimating and DrawingsIn pilot
Customer proposalProposalsIn the product
Mill orders and buyoutsProcurementIn the product
Job costing and change requestsProject ControlsIn the product
Delivery and erectionExecutionIn the product
Steel price exposureSteel IntelligenceReference data
Freight and landed costFreight and logisticsReference data

What’s included for manufacturing & fabrication, and its status today.

Every workspace is opened by arrangement after a conversation. The label beside each capability says how far it is in the product today.

Start from the Steel Fabrication pack: raw material, shop labour, coating, freight and scrap.

An issued revision where every total opens into its quantity, rate and formula.

Used by invited estimators while the engine replaces the classic estimator.

Classic estimating

In the product

Racking and ground-mount structure manufacturers can quote in the classic estimator today.

An approved estimate published to the project.

Drawings

In the product

Extract bills of material from drawings and compare revisions.

Reviewed quantities and a record of what changed between drawing revisions.

Proposals

In the product

Branded quotes with pricing, assumptions and exclusions.

A reviewed proposal document and PDF tied to the project.

Procurement

In the product

Buy material and services against the issued quantities.

An awarded commitment on the same lines the estimate issued.

Comparison never awards a supplier. A buyer does.

Project Controls

In the product

Job cost, commitments, change records and forecast by cost code.

Estimate at completion and variance on the structure the estimate issued.

It is not a general ledger or treasury system.

Execution

In the product

Deliveries and erection progress when your scope includes site work.

Installed quantities in the units of the estimate, and the closeout record.

It is not a compliance-certification system.

Steel Intelligence

Reference data

Stored steel index, consumption, galvanizing and escalation assumptions.

A documented steel assumption behind an estimate or a buy.

It is not a live mill quote.

Trade & Tariff

Reference data

Stored origin and duty scenarios before you lock a source.

A recorded duty and origin assumption.

A stored reference catalog. It is not customs, legal, or tax advice.

Freight and logistics

Reference data

Freight estimates and landed-cost comparisons for deliveries.

A freight and landed-cost assumption on the package.

Rates are estimates, not carrier quotes.

In the product
Deployed in the application for organizations Infrenta has onboarded.
In pilot
Built and in use with invited users. Not yet the default for every organization.
Reference data
Stored, versioned reference that informs a decision. Not a live feed or advice.
Planned
Designed and on the roadmap. Not available yet.

Bring a real job. We’ll walk it with you.

Tell us which handoff costs you the most: estimate to purchasing, purchasing to cost, or cost to the field. We walk that workflow with you, in your industry’s terms.

See pricing

What happens next

  1. 1Tell us your industry and the handoff that hurts.
  2. 2We reply by email to set a time.
  3. 3We walk it on a worked example and your own project questions.
  4. 4Access, roles, and data handling are on the Security page.